Amersham & Wycombe College
No.1 site manager for the finishing and completion
stages plus all external work of a £1m Brick and Block new build extension to a College campus.
• Take ownership of Health & Safety documentation.
• Ingest all technical drawings to instruct contractors.
• Excavate and complete FW and RW drainage.
• Construction & surfacing for an access ramp
• Screeding unfinished rooms within the building.
• Drive electricians through 1st & 2nd fix.
• Drive plumbers through 1st & 2nd fix.
• Block paving, Resin paving, Tarmac
• Connect all surface drainage to RW connections.
• Foundations and Brickwork to Retaining walls.
• Installation of an external tensioned canvas cover.
• Installatio of a Geodesic Horticulture Pod.
• Linking Utilities (Water & Electric) into the building.
• Bathroom, Toilet and Cabinetry installations.
• All Joinery for Doors and skirting throughout.