Amersham & Wycombe College

No.1 site manager for the finishing and completion

stages plus all external work of a £1m Brick and Block new build extension to a College campus.

 

• Take ownership of Health & Safety documentation.
• Ingest all technical drawings to instruct contractors.
• Excavate and complete FW and RW drainage.
• Construction & surfacing for an access ramp
• Screeding unfinished rooms within the building.
• Drive electricians through 1st & 2nd fix.

• Drive plumbers through 1st & 2nd fix.
• Block paving, Resin paving, Tarmac

• Connect all surface drainage to RW connections.

• Foundations and Brickwork to Retaining walls.
• Installation of an external tensioned canvas cover. 

• Installatio of a Geodesic Horticulture Pod.
• Linking Utilities (Water & Electric) into the building.
• Bathroom, Toilet and Cabinetry installations.

• All Joinery for Doors and skirting throughout.

For bookings please call 07449 201 503

  • LinkedIn Social Icon

Please contact me with any No.1 on site, Project Manager, Construction Manager, Operations Manager or related Senior construction roles that are located in London and The Home Counties in the M4 and M40 regions outside of the M25.

​

My CV is available to look at by following the LinkedIn icon.

All image rights are reserved. All images are property of Thames Valley Construction Management Ltd and are projects that i have run as a No.1 on site.

bottom of page