Heath Lodge Hanwell
No.1 site manager for a £2.2m new build residential project. I was brought onto site with the structure completed but it still needed topping out, glazing, cladding plus all internal works and external groundworks to be completed. I was required to tackle critical issues head on without any hesitation to drive it through to completion.
• Roof structure, insulate and single ply membrane.
• Install 20 way water manifold system.
• Screed all dwellings and communal areas.
• Complete Lift shaft build plus install lift.
• Install Glazing to the whole building.
• Crane & Install Steel framework for balconies
• 1st & 2nd Fix Electrics throughout
• 1st & 2nd Fix Plumbing throughout
• Dry Lining, MF Ceiling and Plastering
• Dry Riser Installation
• Kitchen and Bathroom fitting throughout
• Comprehensive Cladding package to all elevations